The client was re-developing their site in Christchurch after the destructive 2011 earthquakes. We designed, fabricated, and installed a fully enclosed, 400 T.P.H, long-span air-supported belt conveyor to transport various products into the bulk storage buildings on site. As part of the upgrade, the bulk intake system required replacement along with the affected structures.